calendar_sheet_integrated_project_manager
为了替代用 Excel、记事本做项目管理的困境而生:: 所有项目数据存在一个 SQLite 的数据库.db 文件里,复制即备份,任何 SQLite 工具可打开,不注册、不联网、不上传。 日历和表格聚合到同一界面:上半日历看时间分布,下半表格看明细,数据同源、筛选互通。每次跟进存…
What XERJ indexed
Selected work

“CLI全命令图标开关 v3.7.2:workbench_ui全子命令+fav二级、main.py check-config接入;图标先播不…”. 17 files, 1,670 lines in the project root, tests, scripts.
Licence
The repository
LICENSE file checked at the pinned commit; the author agreed to inclusion.
The XERJ corpus
The author agreed by email on 2026-11-10. Same terms as the repository. Answers name the repo, the commit and the file:line.
selected for the XERJ Corpus Hublicence clearedsuggested use: adapt with attribution
The prompt
Paste it into your AI agent. It clones xzf89718/calendar_sheet_integrated_project_manager at the pinned commit and indexes it on your machine.
Search the GitHub repository xzf89718/calendar_sheet_integrated_project_manager with XERJ (https://hub.xerj.org/corpus/xzf89718--calendar-sheet-integrated-project-manager). Run these in a shell, in order, and check each result before the next: 1. xerj --help (success: it prints usage). If xerj is missing: curl -fsSL https://xerj.org/get | sh 2. git clone https://github.com/xzf89718/calendar_sheet_integrated_project_manager calendar_sheet_integrated_project_manager && git -C calendar_sheet_integrated_project_manager checkout cc9bb762e221227717bede656ef724c2975c9620 3. Start a local node and leave it running: xerj --insecure --data-dir ./xerj-data 4. xerj autoindex ./calendar_sheet_integrated_project_manager --url http://127.0.0.1:9200 --prefix calendar-sheet-integrate --progress plain 5. xerj autoindex map --url http://127.0.0.1:9200 Then answer my question from the indexed files and cite the ax_path of every hit. Query syntax: https://xerj.org/llms.txt Licence: MIT. Keep the copyright notice and credit the authors.
Related
Zifeng1997Databases and storage engines corpora
Selected work and consent: the XERJ registry.