← all corpora

uk-building-regs

reference corpus · status live · domain STD (Standards, specs and regulations) · lane A · refresh pinned · tags UK · LAW · CONSTRUCTION · STANDARDS

What an agent uses it for

current UK Building Regulations 2010 text: what work must comply with, materials, loading, exemptions, notices

Use it
xerj corpus add --from https://raw.githubusercontent.com/xerj-org/xerj/corpus-hub/tools/xerj-code/hub/uk-building-regs.json
xerj corpus index uk-building-regs then xerj code uk-building-regs "your question"

Sources and pins

sourcepinlicencesizereview note
corpus-uk-building-regs d4669402330fNONE-FOUND 522.7 KB / 197 files Building Regulations 2010 (SI 2010/2214) as CLML XML -> 194 per-provision files (England inline, differing Wales variants appended labelled; 44ZB/44ZC dual numbering and repealed Schedules 4A/5 documented). Approved Documents out of scope. G7 5/5 pass 5/5 relevant. Evidence: backlog/g7-night2-2026-10-04-graded.json

522.7 KB across 197 files. Added 2026-10-04.

Rights

NONE-FOUND. Redistribution permitted with attribution per the licence review. The review block records a human opening each licence file at the pin. Detector output is a hint, never the verdict.

Retrieval spot-check (G7)

5.0/5 relevant. Graded .

Q: what must building work comply with in schedule 1
expect: regs/reg-04.txt
top-5: corpus-uk-building-regs/regs/reg-18.txt / corpus-uk-building-regs/regs/reg-18.txt / corpus-uk-building-regs/regs/reg-04.txt / corpus-uk-building-regs/regs/reg-14.txt / corpus-uk-building-regs/regs/reg-20a.txt
grade: pass
Q: materials for building work must be what
expect: regs/reg-07.txt
top-5: corpus-uk-building-regs/regs/reg-16.txt / corpus-uk-building-regs/regs/reg-18.txt / corpus-uk-building-regs/regs/reg-07.txt / corpus-uk-building-regs/regs/reg-18.txt / corpus-uk-building-regs/regs/reg-04.txt
grade: pass
Q: structural loading dead imposed wind loads transmitted to the ground
expect: schedules/sched-1.txt
top-5: corpus-uk-building-regs/schedules/sched-1.txt / corpus-uk-building-regs/schedules/sched-1.txt / corpus-uk-building-regs/schedules/sched-3.txt / corpus-uk-building-regs/regs/reg-46a.txt / corpus-uk-building-regs/regs/reg-46b.txt
grade: pass
Q: exempt small detached buildings floor area limit
expect: schedules/sched-2.txt
top-5: corpus-uk-building-regs/schedules/sched-2.txt / corpus-uk-building-regs/regs/reg-09.txt / corpus-uk-building-regs/regs/reg-02.txt / corpus-uk-building-regs/schedules/sched-4.txt / corpus-uk-building-regs/schedules/sched-3a.txt
grade: pass
Q: how much notice before starting building work
expect: regs/reg-16.txt
top-5: corpus-uk-building-regs/regs/reg-52.txt / corpus-uk-building-regs/regs/reg-50.txt / corpus-uk-building-regs/regs/reg-19b.txt / corpus-uk-building-regs/regs/reg-14.txt / corpus-uk-building-regs/regs/reg-16.txt
grade: pass